Daytime Ramp Closure Planned on I-20 Wednesday
By Office of Communication
Posted on February 23, 2021, February 23, 2021

I-30 Detour Map

TxDOT is advising drivers to expect delays on Interstate 20 Wednesday, Feb. 24 from 9 a.m. until 3 p.m. During these hours, the westbound I-20 ramp to northbound SH 360 will be closed for sign construction. Traffic will be detoured to the next exit to South Collins Street, cross I-20, and return via the I-20 eastbound mainlanes to the I-20 interchange.

The work is part of the $233 million Interstate 30/SH 360 Interchange Project and the SH 360 Widening Project. Closures are subject to changes due to weather and schedule. For more information, please visit the Keep 30360 Moving website.

 New or updated items are indicated in bold.

 The City of Arlington has partnered with Waze to give drivers the best experience possible to get around town. Drivers can download Waze for free at www.waze.com/get for iOS and Android and see real-time traffic, find optimal routes, avoid road closures and more.

Weekly Lane Closure Look Ahead

Closures are subject to changes due to weather and schedule. Below are anticipated traffic impacts for the coming weeks.

Click here to learn more about the I-30/SH 360 Interchange Project.

I-30 Mainlanes and Ramps 

I-30 Eastbound Mainlanes

  • POSTPONED DUE TO WEATHER: I-30 eastbound mainlanes between Baird Farm Road and Great Southwest Parkway will be reduced to one lane to place bridge beams. EXPECT DELAYS.

I-30 Eastbound Entrance from Convention Center Drive/Copeland Road Intersection 

  • PERMANENT: The eastbound I-30 entrance ramp available from the Convention Center Drive/Copeland Road intersection will be closed permanently. Traffic will continue to have access to the ramp to northbound Ballpark Way.

I-30 Eastbound Entrance from Northbound Ballpark Way

  • PERMANENT: The eastbound I-30 entrance ramp from northbound Ballpark Way will be closed permanently for the construction of a new northbound Ballpark Way connector to eastbound Copeland Road

I-30 Westbound Entrance from SH 360/Six Flags Drive

  • POSTPONED DUE TO WEATHER: The I-30 westbound entrance from SH 360/Six Flags Drive will be closed for overhead bridge work. Traffic will be detoured east on I-30 to exit SH 161, cross over I-30 and return on the I-30 westbound mainlanes.

I-30 Westbound Exit to SH 360/Six Flags Drive

  • POSTPONED DUE TO WEATHER: The I-30 westbound exit to SH 360/Six Flags Drive will be closed for overhead bridge work. Traffic will be detoured west on I-30 to exit FM 157/Collins Street, cross over I-30, and return on the I-30 eastbound mainlanes.

I-30 HOV Lanes (between Great Southwest Parkway and Cooper Street)

Westbound I-30 HOV lane west of SH 161

  • Through 2021, The westbound HOV lane west of SH 161 will be closed. TEXpress lane traffic will be directed into the I-30 westbound general main lanes west of SH 161.

Eastbound I-30 HOV lane between Center Street and Duncan Perry Road

  • Through 2021, The eastbound HOV lane access near Center Street and lane through Tarrant County will be closed. TEXpress lane traffic will enter at SH 161.

I-20 Mainlanes and Ramps

I-20 Westbound to SH 360 Northbound Ramp

  • Feb. 24, 9 a.m. - 3 p.m.: The I-20 westbound to SH 360 northbound ramp will be closed for sign construction. Traffic will be detoured to the next exit to Collins Street, cross I-20, and return via the I-20 eastbound mainlanes to the I-20 interchange. EXPECT DELAYS.

SH 360 Mainlanes and Ramps

SH 360 Southbound Mainlanes

  • Daily (as needed), through March 5, 9 a.m. - 3 p.m., and nightly (as needed), through March 5, 7 p.m. - 6 a.m.: Various lanes of SH 360 southbound mainlanes between Division Street and Kingswood Boulevard will be closed for installing signs, placing permanent pavement striping, and moving temporary concrete traffic safety barrier.
  • Continuously through Fall 2021: SH 360 southbound mainlanes will be reduced to two lanes between Avenue J and Six Flags Drive for SH 360 northbound mainline and frontage road construction. EXPECT DELAYS

SH 360 Northbound Mainlanes

  • Daily (as needed), through March 5, 9 a.m. - 3 p.m., and nightly (as needed), through March 5, 7 p.m. - 6 a.m.: Various lanes of SH 360 southbound mainlanes between Kingswood Boulevard and Division Street will be closed for installing signs, placing permanent pavement striping, and moving temporary concrete traffic safety barrier.
  • Beginning Nov. 1: SH 360 northbound mainlanes will be temporarily shifted between Six Flags Drive and Avenue J onto the new SH 360 southbound mainline bridge. Click here to learn more.

SH 360 Southbound Entrance from Brown Boulevard/Avenue K

  • PERMANENT: The SH 360 southbound entrance from Brown Boulevard/Avenue K is PERMANENTLY CLOSED. Traffic is detoured along the SH 360 southbound frontage road to enter from the Six Flags Drive entrance ramp. A new entrance ramp will be constructed between Lamar Boulevard and Six Flags Drive.

SH 360 Southbound Exit to Ave J/Lamar Boulevard/Six Flags Drive/Randol Mill Road

  • A new SH 360 southbound exit ramp to Avenue J/Lamar Boulevard is open to traffic.

SH 360 Southbound Exit to Lamar Boulevard

  • PERMANENT: The SH 360 southbound exit to Lamar Boulevard is PERMANENTLY CLOSED. Traffic is detoured to exit to Brown Boulevard/Avenue K and follow the SH 360 southbound frontage road to Lamar Boulevard. A new exit ramp will be constructed to Avenue J/Lamar Boulevard/Six Flags Drive.

SH 360 Southbound Entrance from Lamar Boulevard 

  • PERMANENT: The SH 360 southbound entrance from Lamar Boulevard is PERMANENTLY CLOSED. Traffic is detoured along the SH 360 southbound frontage road to enter from the Six Flags Drive entrance ramp. A new entrance ramp will be constructed between Lamar Boulevard and Six Flags Drive.

SH 360 Northbound Exit to Lamar Boulevard

  • Through Fall 2021: The SH 360 northbound exit to Lamar Boulevard will be closed for reconstruction. Traffic will be directed to exit Six Flags Drive and continue on the northbound frontage road to Lamar Boulevard

SH 360 Northbound Exit to I-30/Six Flags Drive/Lamar Boulevard/Avenue J

  • The SH 360 northbound exit to Six Flags Drive/Lamar Boulevard/Avenue J was moved to a new, temporary exit ramp. BE AWARE OF NEW TRAFFIC PATTERN.

SH 360 Southbound Entrance from Abram Street 

  • Daily (as needed), through Mach 5, 9 a.m. - 3 p.m.: The SH 360 southbound entrance ramp from Abram Street will be closed for general construction. Traffic will be detoured to the next entrance ramp from Park Row Drive.

SH 360 Northbound Exit to SP 303/Pioneer Parkway/Park Row Drive

  • Feb. 24, 9 a.m. - 3 p.m., and overnight, Feb. 25, 7 p.m. - 6 a.m.: The SH 360 northbound exit to SP 303/Pioneer Parkway/Park Row Drive will be closed to install overhead signs. Traffic will be directed to use the prior exit ramp to Arkansas Lane.

SH 360 Northbound Entrance from SP 303/Pioneer Parkway

  • Overnight, Feb. 23, 7 p.m. - 6 a.m.: The SH 360 northbound entrance from SP 303/Pioneer Parkway will be closed to install overhead signs. Traffic will be detoured to the next entrance ramp from Park Row Drive.

SH Southbound Entrance from SP 303/Pioneer Parkway

  • Feb. 26, 9 a.m. - 3 p.m.: The SH 360 southbound entrance from SP 303/Pioneer Parkway will be closed to install an overhead sign. Traffic will be detoured to the next entrance ramp from Arkansas Lane.

SH 360 Frontage Road

SH 360 Southbound Frontage Road

Division Street to Mitchell Street 

  • Daily (as needed), through March 5, 9 a.m. - 3 p.m.: The left, inside lane of SH 360 southbound frontage road between Division Street and Mitchell Street is closed for sound wall construction and finish work.

Arkansas Lane to Mayfield Road

  • Daily through Feb. 25, 9 a.m. - 3 p.m.: The left, inside lane of SH 360 southbound frontage road between Arkansas Lane and Mayfield Road will be closed for general construction.

SH 360 South-to-North U-turn at Lamar Boulevard

  • The SH 360 south-to-north U-turn at Lamar Boulevard will be closed while the SH 360 mainlanes and northbound frontage road are under construction.

SH 360 South-to-North U-turn at Six Flags Drive

  • The SH 360 south-to-north U-turn at Six Flags Drive will be closed while the SH 360 mainlanes and northbound frontage road are under construction.

SH 360 South-to-North U-turn at Abram Street

  • Continuously through March 5: The SH 360 south-to-north U-turn at Abram Street will be closed for SH 360 bridge work.

SH 360 Northbound Frontage Road

Mitchell Street to Division Street

  • Continuous through March 5: The left, inside lane of SH 360 northbound frontage road between Mitchell Street to Division Street is closed for sound wall construction and finish work.

SH 360 North-to-South U-turn at Abram Street

  • Continuously through March 5: The SH 360 north-to-south U-turn at Abram Street will be closed for SH 360 bridge work.

SH 360 North-to-South U-turn at Six Flags Drive

  • The SH 360 north-to-south U-turn at Six Flags Drive will be closed while the SH 360 mainlanes and northbound frontage road are under construction.

SH 360 North-to-South U-turn at Lamar Boulevard

  • The SH 360 north-to-south U-turn at Lamar Boulevard will be closed while the SH 360 mainlanes and northbound frontage road are under construction.

Local Streets

Copeland Road

  • PERMANENT: Copeland Road between Six Flags Drive and the SH 360 southbound frontage is closed.
  • PERMANENT: Westbound Copeland Road from Six Flags Drive to just east of Ballpark Way is permanently closed. Only eastbound Copeland Road traffic will be allowed between Ballpark Way and Six Flags Drive.

Convention Center Drive/Copeland Road Intersection 

  • PERMANENT: The I-30 eastbound entrance ramp available from this intersection was removed permanently from service. Access to northbound Ballpark Way is maintained.

105th Street

  • PERMANENT: 105th Street between Six Flags Drive and Avenue E is permanently closed and will be removed.

Abram Street

  • Daily (as needed), through March 5, 9 a.m. - 3 p.m.: Various lanes of eastbound and westbound Abram Street will be closed for general construction.
Enhance Regional Mobility, I-30/SH 360 Interchange, SH 360 Widening Project, Street Construction Projects
News, Headlines, Streets