TxDOT: Eastbound I-20 Closed at US 287 Nightly Through May 3
By Office of Communication
Posted on April 19, 2024, April 19, 2024

Southeast Connector Project

Want to stay in the know about the Texas Department of Transportation's Southeast Connector Project and how construction activity may affect your commute? Each Friday, the City of Arlington will share the latest information about the $2.1 billion project, which will rebuild and widen approximately 11 miles of I-20, I-820 and US 287 between now and 2027.

 Residents can also add their contact information on the Southeast Connector Project website to receive updates directly via text or email

When complete, the Southeast Connector Project will tie in the east and southeast part of Tarrant County to the central part of the county while relieving congestion, increasing safety and improving efficiency for the entire Metroplex.

Closures listed below are subject to changes due to weather and schedule. For more information, project photos and a full list of detours and closures, please visit the Southeast Connector Project website. Residents can also contact [email protected] or call 844-820-2870.

Please note: Speed limits are now reduced to 55 mph within the entire corridor.   

Main Lanes  

I-820 at Ramey Avenue

  • Through May 3: Southbound I-820 reduced to one lane between Ramey Avenue and Willbarger Street.

Eastbound I-20 at US 287

  • Highway Closure: Eastbound I-20 closed at US 287. 11 p.m. to 6 a.m. through May 3. (LCN 419, 841)
  • Eastbound I-20 reduced to one lane at US 287. 9 p.m. to 6 a.m. Apr. 23 through May 7. (LCN 390, 660, 675)

Southbound US 287 at Village Creek Road

  • Highway Closure: Southbound US 287 closed at Village Creek Rd. 9 p.m. to 6 a.m. Apr. 5 through Apr. 19.
  • Southbound US 287 frontage road reduced to one lane at Village Creek Rd. 9 a.m. to 3 p.m. through Apr. 30.
  • 9 p.m. to 6 a.m. through April 30: Southbound US 287 reduced to one lane at Village Creek Road.

Southbound I-820 at Berry Street

  • Through April 19: Southbound I-820 reduced to one lane of traffic between East Berry Street and Willbarger Street.

Southbound US 287 at Little Road

  • 11 p.m. to 6 a.m. through Apr. 30: Southbound US 287 reduced to one lane between I-20 and  Little Road.
  • Southbound US 287 reduced to one lane at Little Rd. 9 p.m. to 6 a.m. Apr. 3 through May 13. (LCN 395, 872, 927)

Westbound I-20 at US 287

  • Lane restrictions on Westbound I-20 at US 287. 11 p.m. to 6 a.m. Apr. 4 through Apr. 25. (LCN 397, 407, 410, 733, 828, 905)
  • Highway Closure: WB I-20 closed at US 287. 11 p.m. to 9 a.m. through Apr. 30. (LCN 843, 842)

Eastbound I-20 at Anglin Drive

  • 9 p.m. to 6 a.m. through Dec. 20: Eastbound I-20 reduced to two lanes between Anglin Drive and I-820.

Westbound I-20 at 820

  • One lane closed on westbound I-20 at I-820. 11 p.m. to 6 a.m. Apr. 4 to Apr. 23.

Northbound US 287 at Martin

  • Northbound US 287 reduced to one lane between Martin St. and Village Creek Rpdd. 9 p.m. to 6 a.m. Apr. 1 through Apr. 17.

Waze

The City of Arlington has partnered with Waze to give drivers the best experience possible to get around town. Drivers can download Waze for free at www.waze.com/get for iOS and Android and see real-time traffic, find optimal routes, avoid road closures and more.

Enhance Regional Mobility, Southeast Connector Project
News, Government, Streets, Headlines