TxDOT is alerting drivers to a major closure planned on I-30. Both directions of the interstate will be reduced to one lane from AT&T Way/Baird Farm Road to Great Southwest Parkway Jan. 21 and 22, 2021 from 8 p.m. until 5 a.m the next morning. Crews will use the time to install bridge beams. 

A second significant closure is planned this weekend on southbound SH 360. The highway will be closed between SH 180/Division Street and Park Row Drive beginning Jan. 22 at 7 p.m. The highway should reopen by 3 a.m. Jan. 25. Drivers will be detoured onto the frontage road during the closure and will re-enter SH 360 at Park Row Drive.

The work is part of the $233 million Interstate 30/SH 360 Interchange Project and the SH 360 Widening Project. Closures are subject to changes due to weather and schedule. For more information, please visit the Keep 30360 Moving website.

 New or updated items are indicated in bold.

 The City of Arlington has partnered with Waze to give drivers the best experience possible to get around town. Drivers can download Waze for free at www.waze.com/get for iOS and Android and see real-time traffic, find optimal routes, avoid road closures and more.

Weekly Lane Closure Look Ahead

Closures are subject to changes due to weather and schedule. Below are anticipated traffic impacts for the coming weeks.

Click here to learn more about the I-30/SH 360 Interchange Project.

I-30 Mainlanes and Ramps 

I-30 Eastbound Mainlanes 

  • Nightly, Jan. 21-22, 8 p.m. - 5 a.m.: I-30 eastbound mainlanes between AT&T Way/Baird Farm Road and Great Southwest Parkway will be reduced to one lane to place bridge beams. EXPECT DELAYS.

I-30 Westbound Mainlanes

  • Nightly, Jan 21-22, 8 p.m. - 5 a.m.: I-30 westbound mainlanes between Great Southwest Parkway and AT&T Way/Baird Farm Road will be reduced to one lane to place bridge beams. EXPECT DELAYS.

I-30 Eastbound Entrance from Convention Center Drive/Copeland Road Intersection 

  • PERMANENT: The eastbound I-30 entrance ramp available from the Convention Center Drive/Copeland Road intersection will be closed permanently. Traffic will continue to have access to the ramp to northbound Ballpark Way.

I-30 Eastbound Entrance from Northbound Ballpark Way

  • PERMANENT: The eastbound I-30 entrance ramp from northbound Ballpark Way will be closed permanently for the construction of a new northbound Ballpark Way connector to eastbound Copeland Road

I-30 HOV Lanes (between Great Southwest Parkway and Cooper Street)

Westbound I-30 HOV lane west of SH 161

  • Through 2021, The westbound HOV lane west of SH 161 will be closed. TEXpress lane traffic will be directed into the I-30 westbound general main lanes west of SH 161.

Eastbound I-30 HOV lane between Center Street and Duncan Perry Road

  • Through 2021, The eastbound HOV lane access near Center Street and lane through Tarrant County will be closed. TEXpress lane traffic will enter at SH 161.

SH 360 Mainlanes and Ramps

SH 360 Southbound Mainlanes

  • Continuous, Jan. 22, 7 p.m.-Jan. 25, 3 a.m.: The SH 360 southbound mainlanes will be closed between SH 180/Division St and Park Row Dr for a traffic switch. Traffic will exit for SH 180/Division St and remain on the southbound frontage road, re-entering from the Park Row Drive entrance ramp. EXPECT DELAYS. SEEK ALTERNATE ROUTES. WATCH FOR NEW TRAFFIC PATTERN.
  • Daily (as needed), through Feb. 5, 9 a.m. - 3 p.m., and nightly (as needed), through Feb. 5, 7 p.m. - 6 a.m.: Various lanes of SH 360 southbound mainlanes between Division Street and Kingswood Boulevard will be closed for installing signs, placing permanent pavement striping, and moving temporary concrete traffic safety barrier.
  • Continuously through Fall 2021: SH 360 southbound mainlanes will be reduced to two lanes between Avenue J and Six Flags Drive for SH 360 northbound mainline and frontage road construction. EXPECT DELAYS

SH 360 Northbound Mainlanes

  • Jan. 19, 8 p.m. - 5 a.m.: SH 360 northbound mainlanes reduced to one lane between Randol Mill Road and Lamar Boulevard to place bridge beams. EXPECT DELAYS.
  • Continuous, Jan. 29, 7 p.m. - Feb, 1, 3 a.m.: The SH 360 northbound mainlanes will be closed between Park Row Drive and SH 180/Division Street for a traffic switch. Traffic will exit for Park Row Drive and remain on the northbound frontage road, re-entering from the SH 180/Division Street/ Abram Street entrance ramp. EXPECT DELAYS. SEEK ALTERNATE ROUTES. WATCH FOR NEW TRAFFIC PATTERN.
  • Daily (as needed), through Feb. 5, 9 a.m. - 3 p.m., and nightly (as needed), through Feb. 5, 7 p.m. - 6 a.m.: Various lanes of SH 360 southbound mainlanes between Kingswood Boulevard and Division Street will be closed for installing signs, placing permanent pavement striping, and moving temporary concrete traffic safety barrier.
  • Beginning Nov. 1: SH 360 northbound mainlanes will be temporarily shifted between Six Flags Drive and Avenue J onto the new SH 360 southbound mainline bridge. Click here to learn more.

SH 360 Southbound Entrance from Brown Boulevard/Avenue K

  • PERMANENT: The SH 360 southbound entrance from Brown Boulevard/Avenue K is PERMANENTLY CLOSED. Traffic is detoured along the SH 360 southbound frontage road to enter from the Six Flags Drive entrance ramp. A new entrance ramp will be constructed between Lamar Boulevard and Six Flags Drive.

SH 360 Southbound Exit to Ave J/Lamar Boulevard/Six Flags Drive/Randol Mill Road

  • A new SH 360 southbound exit ramp to Avenue J/Lamar Boulevard is open to traffic.

SH 360 Southbound Exit to Lamar Boulevard

  • PERMANENT: The SH 360 southbound exit to Lamar Boulevard is PERMANENTLY CLOSED. Traffic is detoured to exit to Brown Boulevard/Avenue K and follow the SH 360 southbound frontage road to Lamar Boulevard. A new exit ramp will be constructed to Avenue J/Lamar Boulevard/Six Flags Drive.

SH 360 Southbound Entrance from Lamar Boulevard 

  • PERMANENT: The SH 360 southbound entrance from Lamar Boulevard is PERMANENTLY CLOSED. Traffic is detoured along the SH 360 southbound frontage road to enter from the Six Flags Drive entrance ramp. A new entrance ramp will be constructed between Lamar Boulevard and Six Flags Drive.

SH 360 Northbound Exit to Lamar Boulevard

  • Through Fall 2021: The SH 360 northbound exit to Lamar Boulevard will be closed for reconstruction. Traffic will be directed to exit Six Flags Drive and continue on the northbound frontage road to Lamar Boulevard

SH 360 Northbound Exit to I-30/Six Flags Drive/Lamar Boulevard/Avenue J

  • Jan. 19, 8 p.m.- 5 a.m.: The SH 360 northbound exit to I-30/Six Flags Drive/Lamar Boulevard/Avenue J will be closed to place bridge beams. Traffic will be directed to use the prior exit to SH 180/Division Street/ Randol Mill Road and continue on the SH 360 northbound frontage road.

SH 360 Northbound Entrance from SH 180/Division Street/Abram Street

  • Jan. 19, 8 p.m. - 5 a.m.: The SH 360 northbound entrance from SH 180/Division Street/Abram Street will be closed to place bridge beams. Traffic will be directed to use the next entrance from Lamar Boulevard.

SH 360 Southbound Entrance from SH 180/Division Street/Randol Mill Road

  • Continuous, Jan. 22, 7 p.m.- Jan. 25, 3 a.m.: The SH 360 southbound entrance from SH 180/Division Street/Randol Mill Road will be closed for a SH 360 southbound mainline traffic shift. Traffic will be directed to the next entrance ramp from Park Row Drive.

SH 360 Southbound Entrance from Abram Street 

  • Overnight, Jan. 20, 7 p.m. - 6 a.m.: The SH 360 southbound entrance ramp from Abram Street will be closed for overhead sign work. Traffic will be detoured to the next entrance ramp from Park Row Drive.
  • Continuous, Jan. 22, 7 p.m. - Jan. 25, 3 a.m.: The SH 360 southbound entrance from Abram Street will be closed for a SH 360 southbound mainline traffic shift. Traffic will be directed to the next entrance ramp from Park Row Drive. 
  • Daily (as needed), through Jan 29., 9 a.m. - 3 p.m.: The SH 360 southbound entrance ramp from Abram Street will be closed for general construction. Traffic will be detoured to the next entrance ramp from Park Row Drive.

SH 360 Northbound Exit to Abram Street

  • Daily (as needed), through Jan. 29, 9 a.m. - 3 p.m.: The SH 360 northbound exit ramp to Abram Street will be closed for general construction. Traffic will be detoured to the prior exit ramp to Park Row Drive.

 SH 360 Northbound Entrance from Park Row Drive

  • Continuous, Jan. 29, 7 p.m. - Feb. 1, 3 a.m.: The SH 360 northbound entrance from Park Row Drive will be closed for a traffic shift on the SH 360 northbound mainlanes. Traffic will be directed to the next entrance ramp from SH 180/Division Street/Abram Street.

SH 360 Northbound Entrance from SP 303/Pioneer Parkway

  • Continuous, Jan. 29, 7 p.m. - Feb. 1, 3 a.m.: The SH 360 northbound entrance from SP 303/Pioneer Parkway will be closed for a traffic shift on the SH 360 northbound mainlanes. Traffic will be directed to the next entrance ramp from SH 180/Division Street/Abram Street.

SH 360 Northbound Exit to SP 303/Pioneer Parkway/Park Row Drive

  • Overnight, Jan. 21, 7 p.m. - 6 a.m.: The SH 360 northbound exit to SP 303/Pioneer Parkway/Park Row Drive will be closed for overhead sign work. Traffic will be directed to the prior exit to Arkansas Lane and proceeding on the SH 360 northbound frontage road.

SH 360 Northbound Entrance from Arkansas Lane

  • Continuous, Jan. 29, 7 p.m. - Feb. 1, 3 a.m.: The SH 360 northbound entrance from Arkansas Lane will be closed for a traffic shift on the SH 360 northbound mainlanes. Traffic will be directed to the next entrance ramp from SH 180/Division Street/Abram Street.

SH 360 Southbound Entrance from Arkansas Lane

  • Daily through Jan. 22, 9 a.m. - 3 p.m.: The SH 360 southbound entrance from Arkansas Lane will be closed for general construction. Traffic will be directed to the next entrance from Mayfield Road.

SH 360 Southbound Entrance from Mayfield Road

  • Overnight, Jan. 21, 7 p.m. - 6 a.m.: The SH 360 southbound entrance from Mayfield Road will be closed for overhead sign work. Traffic will be detoured along the SH 360 frontage road to enter from the Arkansas Lane entrance ramp.

SH 360 Southbound Exit to I-20 Eastbound

  • Overnight, Jan. 21, 7 p.m. - 6 a.m.: The SH 360 southbound exit to I-20 eastbound will be closed for overhead sign work. Traffic will be directed to the next exit to Green Oaks Boulevard/Kingswood Boulevard, cross under SH 360, and return via the SH 360 northbound mainlanes to I-20 access ramps.

SH 360 Southbound Exit to I-20 Westbound

  • Overnight, Jan. 21, 7 p.m. - 6 a.m.: The SH 360 southbound exit to I-20 eastbound will be closed for overhead sign work. Traffic will be directed to the next exit to Green Oaks Boulevard/Kingswood Boulevard, cross under SH 360, and return via the SH 360 northbound mainlanes to I-20 access ramps.

    SH 360 Frontage Road

    SH 360 Southbound Frontage Road

    Brown Boulevard to Lamar Boulevard

    • Daily, through Jan. 23, 9 a.m. - 3 p.m.: Various lanes of SH 360 southbound frontage road will be closed between Brown Boulevard and Lamar Boulevard for finish work.

    Division Street to Mitchell Street

    • Continuous through Feb. 5: The left, inside lane of SH 360 southbound frontage road between Division Street and Mitchell Street is closed for sound wall construction and finish work.

    Arkansas Lane to Mayfield Road

    • Daily through Feb. 25, 9 a.m. - 3 p.m.: The left, inside lane of SH 360 southbound frontage road between Arkansas Lane and Mayfield Road will be closed for general construction.

    SH 360 South-to-North U-turn at Lamar Boulevard

    • The SH 360 south-to-north U-turn at Lamar Boulevard will be closed while the SH 360 mainlanes and northbound frontage road are under construction.

    SH 360 South-to-North U-turn at Six Flags Drive

    • The SH 360 south-to-north U-turn at Six Flags Drive will be closed while the SH 360 mainlanes and northbound frontage road are under construction.

    SH 360 South-to-North U-turn at Abram Street

    • Continuously through Feb. 5: The SH 360 south-to-north U-turn at Abram Street will be closed for SH 360 bridge work.

    SH 360 Northbound Frontage Road

    SP 303/Pioneer Parkway to Park Row Drive

    • Daily through Jan. 25, 9 a.m. - 3 p.m.: The left, inside lane of SH 360 northbound frontage road between SP 303/Pioneer Parkway and Park Row Drive will be closed for general construction.

    Mitchell Street to Division Street

    • Continuous through Feb. 5: The left, inside lane of SH 360 northbound frontage road between Mitchell Street to Division Street is closed for sound wall construction and finish work.

    Six Flags Drive to Avenue J

    • Daily through Jan.  22, 9 a.m. - 3 p.m.: Various lanes of SH 360 northbound mainlanes will be closed between Randol Mill Road and Six Flags Drive to place pavement striping and perform grading work.

    SH 360 North-to-South U-turn at Abram Street

    • Continuously through Feb. 5: The SH 360 north-to-south U-turn at Abram Street will be closed for SH 360 bridge work.

    SH 360 North-to-South U-turn at Six Flags Drive

    • The SH 360 north-to-south U-turn at Six Flags Drive will be closed while the SH 360 mainlanes and northbound frontage road are under construction.

    SH 360 North-to-South U-turn at Lamar Boulevard

    • The SH 360 north-to-south U-turn at Lamar Boulevard will be closed while the SH 360 mainlanes and northbound frontage road are under construction.

    Local Streets

    Six Flags Drive

    • Nightly, through Jan. 31, 8 p.m. - 5 a.m.: Six Flags Drive under SH 360 will be closed to place bridge beams. Eastbound Six Flags Drive traffic will be detoured south on the SH 360 southbound frontage road, crossing under SH 360 at Randol Mill Rd, and return via the SH 360 northbound frontage road. Westbound Six Flags Drive traffic will be detoured north on the SH 360 northbound frontage road, crossing under SH 360 at Lamar Boulevard, and return via the SH 360 southbound frontage road.

    Copeland Road

    • PERMANENT: Copeland Road between Six Flags Drive and the SH 360 southbound frontage is closed.
    • PERMANENT: Westbound Copeland Road from Six Flags Drive to just east of Ballpark Way is permanently closed. Only eastbound Copeland Road traffic will be allowed between Ballpark Way and Six Flags Drive.

    Convention Center Drive/Copeland Road Intersection 

    • PERMANENT: The I-30 eastbound entrance ramp available from this intersection was removed permanently from service. Access to northbound Ballpark Way is maintained.

    105th Street

    • PERMANENT: 105th Street between Six Flags Drive and Avenue E is permanently closed and will be removed.

    Abram Street

    • Daily, through Feb. 5, 9 a.m. - 3 p.m.: Various lanes of eastbound and westbound Abram Street will be closed for general construction.