• 109th Street (Avenue E to Randol Mill Road):  2017 Water and Sanitary Sewer Replacement
  • 113th Street (Avenue E to east dead end):  2017 Water and Sanitary Sewer Replacement
  • 113th Street (Randol Mill Road to Dalworth Street):  2017 Water and Sanitary Sewer Replacement
  • Abram Street (Cooper Street to Collins Street): Rebuilding Abram Street, including water, sanitary sewer, and stormwater facilities
  • Altman Drive (Center Street to east end of cul-de-sac):  Johnson Creek Sewer (Center Street to Collins Street) - Reroute sewer lines in Johnson Creek with 2,100 linear feet of sewer running in Center Street, Thannisch Drive, and Roosevelt Street
  • Avondale Court (Thannisch Drive to north end of cul-de-sac):  Johnson Creek Sewer (Center Street to Collins Street) - Reroute sewer lines in Johnson Creek with 2,100 linear feet of sewer running in Center Street, Thannisch Drive, and Roosevelt Street
  • Belvedere Drive (Collins Street to Mitchell Street):  2018 CDBG Residential Rebuild – Rebuild roadway, stormwater, water, and sanitary sewer infrastructure improvements; street lights, and sidewalks
  • Briarwood Boulevard/Sherwood Drive (Intersection Only):  Davis Pressure Plane Phase 1 – Water line improvements to increase water pressure, sanitary sewer renewals, and street reclamation
  • Briarwood Boulevard/Westview Terrace (Intersection Only):  Davis Pressure Plane Phase 1 – Water line improvements to increase water pressure, sanitary sewer renewals, and street reclamation
  • Brockgreen Court (Williamsburg Manor to north end of cul-de-sac):  2018 Water Main Replacement - Water main replacement
  • Burningtree Court (Williamsburg Manor to north end of cul-de-sac):  2018 Water Main Replacement - Water main replacement
  • Cavendish Drive (Center Street to Barrington Place):  2018 Water Main Replacement - Water main replacement
  • Center Street (Approximately 400-feet north of Thannisch Drive to Thannisch Drive):  Johnson Creek Sewer (Center to Collins) - Reroute sewer lines in Johnson Creek with 2,100 linear feet of sewer running in Center Street, Thannisch Drive, and Roosevelt Street
  • Center Street Bridge (1204 to 1219 N. Center Street):  Johnson Creek Sewer (Center to Collins) - Reroute sewer lines in Johnson Creek with 2,100 linear feet of sewer running in Center Street, Thannisch Drive, and Roosevelt Street
  • Collins Street (Debbie Lane to 100-feet north of Debbie Lane):  2019 Concrete Panel & Sidewalk Replacement - Removal and replacement of curb, gutter, concrete panels and failed sections of sidewalks
  • Collins Street (Mayfield Road to Interstate 20):  Constructing two additional lanes and adding southbound right turn lanes at both Arbrook Boulevard and IH-20. Additional improvements include replacing existing concrete panels as needed; adjusting water and sanitary sewer facilities; replacing traffic signals, street lights, pavement markings, street signs, sidewalks, fiber conduit, and median landscaping and irrigation improvements
  • Cooper Street (Back of curb from Abram Street to Main Street):  Abram Street Rebuild (Cooper Street to Collins Street) - Rebuild roadway with improved stormwater, water, and sanitary sewer infrastructure; pedestrian enhancements, street lighting, and landscaping
  • Cumberland Court (Center Street to east end of cul-de-sac):  2018 Water Main Replacement - Water main replacement
  • Daniel Drive (Mayfield Drive to Green Hill Drive):  2018 Water Main Replacement - Water main replacement
  • Davis Drive (UTA Boulevard to Park Row Drive):  Davis Pressure Plane Phase 1 – Water line improvements to increase water pressure, sanitary sewer renewals, and street reclamation
  • Dick Price Road (Hudson Cemetery Road to Eden Road):  High Point Sanitary Sewer Emergency Repair – Repair of 80 linear feet of collapsed sanitary sewer main
  • Doty Lane (3401 Doty Lane to 3407 Doty Lane):  Sublett Creek Neighborhood Drainage Improvements – Stormwater, paving, water and sanitary sewer improvements; channel turf reinforcement, and pedestrian lighting
  • Drummond Drive/Sanford Street (Intersection Only):  Davis Pressure Plane Phase 1 – Water line improvements to increase water pressure, sanitary sewer renewals, and street reclamation
  • Durham Drive (Center Street to Parrington Place):  2018 Water Main Replacement - Water main replacement
  • East Road to Six Flags Street (Collins Street to Nolan Ryan Expressway):  Road to Six Flags and New Haven – water and sanitary sewer renewal
  • Eden Road (Grauton Drive to Dick Price Road):  High Point Sanitary Sewer Emergency Repair – Repair of 80 linear feet of collapsed sanitary sewer main
  • Elm Street (Third Street to Third Street):  2017 Residential Rebuild Phase 2 - Rebuild roadway, stormwater, water, and sanitary sewer infrastructure improvements; street lights, and sidewalks
  • Fallcreek Street (Stonecreek Drive to Timberview Lane):  2018 Water Main Replacement - Water main replacement
  • Fielder Road (Killian Drive to W. Second Street):  Davis Pressure Plane Phase 1 – Water line improvements to increase water pressure, sanitary sewer renewals, and street reclamation
  • Fleetwood Court (Stonecreek Drive to east end of cul-de-sac):  2018 Water Main Replacement - Water main replacement
  • Gateway Park Pond (815 W. Arbrook Boulevard): Upper Johnson Creek Dredging – Sediment removal
  • Grandview Drive (Oakwood Lane to 1616 Greencove Drive):  Greencove Drainage Improvements – Drainage improvements to provide capacity to contain runoff from a 100-year storm within the ROW, water and sanitary sewer line renewals, and roadway reclamation
  • Grauton Drive (Hudson Cemetery Road to Eden Road):  High Point Sanitary Sewer Emergency Repair – Repair of 80 linear feet of collapsed sanitary sewer main
  • Green Oaks Boulevard (Collins Street to Yaupon Drive):  2019 Concrete Panel & Sidewalk Replacement - Removal and replacement of curb, gutter, concrete panels and failed sections of sidewalks
  • Heatherbrook Drive (100 feet north of Latham Court to 100 feet south of Latham Court):  Sublett Creek Neighborhood Drainage Improvements – Stormwater, paving, water and sanitary sewer improvements; channel turf reinforcement, and pedestrian lighting
  • High Point Road (Cooper Street to Arbrook Boulevard):  High Point Water and Sewer Renewal – Renew 8-inch sewer main
  • Highridge Drive (Arkansas Lane to Center Street):  2018 Water Main Replacement - Water main replacement
  • Hollow Creek Road (3401 to 3451 Hollow Creek Road):  Sublett Creek Neighborhood Drainage Improvements – Stormwater, paving, water and sanitary sewer improvements; channel turf reinforcement, and pedestrian lighting
  • Hosack Street (Center Street to Mary Street):  2017 Residential Rebuild Phase 2 - Rebuild roadway, stormwater, water, and sanitary sewer infrastructure improvements; street lights, and sidewalks
  • Inverness Drive/Saint Clair Drive (Intersection Only):  2017 Residential Rebuild Phase 2 - Rebuild roadway, stormwater, water, and sanitary sewer infrastructure improvements; street lights, and sidewalks
  • Inwood Drive (Collins Street to Daniel Drive):  2017 Residential Rebuild Phase 2 - Rebuild roadway, stormwater, water, and sanitary sewer infrastructure improvements; street lights, and sidewalks
  • Kelly Terrace (Collins Street to Park Row Drive):  2019 CDBG Residential Rebuild – Rebuild roadway, stormwater, water, and sanitary sewer infrastructure improvements; street lights, and sidewalks
  • Lakes at Matlock Pond (700 Central Park Drive):  Upper Johnson Creek Dredging – Sediment removal
  • Latham Court (Heatherbrook Drive to east dead end):  Sublett Creek Neighborhood Drainage Improvements – Stormwater, paving, water and sanitary sewer improvements; channel turf reinforcement, and pedestrian lighting
  • Loretta Day Drive (Ballweg Road to Mule Deer Drive):  2019 Concrete Panel & Sidewalk Replacement - Removal and replacement of curb, gutter, concrete panels and failed sections of sidewalks
  • Lynn Creek Drive (Country Club Drive to Knottingham Drive – Sidewalks Only):  2018 ADA and Safe Route/Sidewalk Project – In-house ADA requests and selected safe route to school locations
  • Magnolia Street/Sanford Street (Intersection Only):  Davis Pressure Plane Phase 1 – Water line improvements to increase water pressure, sanitary sewer renewals, and street reclamation
  • Mary Street (Mitchell Street to Ray Street):  2017 Residential Rebuild Phase 2 - Rebuild roadway, stormwater, water, and sanitary sewer infrastructure improvements; street lights, and sidewalks
  • Matlock Road (Matlock Meadow Drive to Quail Briar Lane):  2019 Concrete Panel & Sidewalk Replacement - Removal and replacement of curb, gutter, concrete panels and failed sections of sidewalks
  • Mitchell Street (Sunnyvale Drive to New York Avenue):  2017 Water and Sanitary Sewer Main Replacement - Water and sanitary sewer main replacement and pavement reclamation
  • Myers Road (Elrod Drive to Sublett Road – Sidewalks Only):  2018 ADA and Safe Route/Sidewalk Project – In-house ADA requests and selected safe route to school locations
  • N. Graham Drive/St Paul Drive (Intersection Pedestrian Ramps Only):  2018 ADA and Safe Route/Sidewalk Project – In-house ADA requests and selected safe route to school locations
  • N.L. Robinson Drive/Sanford Street (Intersection Pedestrian Ramps Only):  Concrete Panel & Sidewalk Replacement Program – Removal and replacement of curb, gutter, concrete panels and failed sections of sidewalks at various locations throughout the City
  • New Haven Street (Skyline Drive to E. Road to Six Flags Street):  Road to Six Flags and New Haven – water and sanitary sewer renewal
  • Nichols Drive (Orchard Drive to Cooper Street):  2017 Water and Sanitary Sewer Main Replacement - Water and sanitary sewer main replacement and pavement reclamation
  • Northridge Drive (Oakwood Lane to Greencove Drive):  Greencove Drainage Improvements – Drainage improvements to provide capacity to contain runoff from a 100-year storm within the ROW, water and sanitary sewer line renewals, and roadway reclamation
  • Oakwood Lane (Northridge Drive to 2001 Oakwood Lane):  Greencove Drainage Improvements – Drainage improvements to provide capacity to contain runoff from a 100-year storm within the ROW, water and sanitary sewer line renewals, and roadway reclamation
  • Orange Street/Sanford Street (Intersection Only):  Davis Pressure Plane Phase 1 – Water line improvements to increase water pressure, sanitary sewer renewals, and street reclamation
  • Orchard Drive (Randol Mill Road to Nichols Drive):  2017 Water and Sanitary Sewer Main Replacement - Water and sanitary sewer main replacement and pavement reclamation
  • Pebblebrook Street (Stonecreek Drive to Williamsburg Manor):  2018 Water Main Replacement - Water main replacement
  • Pecan Street (Abram Street to Main Street):  Abram Street Rebuild (Cooper Street to Collins Street) - Rebuild roadway with improved stormwater, water, and sanitary sewer infrastructure; pedestrian enhancements, street lighting, and landscaping
  • Primrose Lane (3121 Primrose Lane):   2017 Residential Rebuild Phase 2 – Repair roadway to mitigate standing water
  • Ray Street (Center Street to Mary Street):  2017 Residential Rebuild Phase 2 - Rebuild roadway, stormwater, water, and sanitary sewer infrastructure improvements; street lights, and sidewalks
  • Rayborn Drive (Biggs Circle to Inwood Drive):  2017 Residential Rebuild Phase 2 - Rebuild roadway, stormwater, water, and sanitary sewer infrastructure improvements; street lights, and sidewalks
  • Redstone Drive (Suffolk Drive to 250-feet east of Suffolk Drive):  Sublett Creek Neighborhood Drainage Improvements – Stormwater, paving, water and sanitary sewer improvements; channel turf reinforcement, and pedestrian lighting
  • Roosevelt Street (230-feet north of Randol Mill Road to 450 north of Randol Mill Road): Johnson Creek Sewer (Center Street to Collins Street) - Reroute sewer lines in Johnson Creek with 2,100 linear feet of sewer running in Center Street, Thannisch Drive, and Roosevelt Street
  • Rose Street (Mesquite Street to Mary Street):  2017 Residential Rebuild Phase 2 - Rebuild roadway, stormwater, water, and sanitary sewer infrastructure improvements; street lights, and sidewalks
  • Sanford Street (Scott Drive to Cooper Street):  Davis Pressure Plane Phase 1 – Water line improvements to increase water pressure, sanitary sewer renewals, and street reclamation
  • Sanford Street (Davis Drive to 300-feet east of Davis Drive):  Davis Pressure Plane Phase 1 – Water line improvements to increase water pressure, sanitary sewer renewals, and street reclamation
  • Scott Drive (120-feet north of Sanford Street):  Davis Pressure Plane Phase 1 – Water line improvements to increase water pressure, sanitary sewer renewals, and street reclamation
  • Second Street (Center Street to Mary Street):  2019 CDBG Residential Rebuild – Rebuild roadway, stormwater, water, and sanitary sewer infrastructure improvements; street lights, and sidewalks
  • SH-360 (Back of curb from Arbrook Blvd to Arkansas Lane):  12-inch water main replacement
  • Southmoor Drive (Collins Street to Daniel Drive):  2017 Residential Rebuild Phase 2 - Rebuild roadway, stormwater, water, and sanitary sewer infrastructure improvements; street lights, and sidewalks
  • St Charles Drive/Pecandale Drive (Intersection Pedestrian Ramps Only):  2018 ADA and Safe Route/Sidewalk Project – In-house ADA requests and selected safe route to school locations
  • St Gregory Street/St Charles Drive (Intersection Pedestrian Ramps Only):  2018 ADA and Safe Route/Sidewalk Project – In-house ADA requests and selected safe route to school locations
  • St Gregory Street/St Paul Drive (Intersection Pedestrian Ramps Only):  2018 ADA and Safe Route/Sidewalk Project – In-house ADA requests and selected safe route to school locations
  • Stonecreek Drive (Center Street to Fallcreek Street):  2018 Water Main Replacement - Water main replacement
  • Stonehenge Drive (Stonecreek Drive to Teakwood Drive):  2018 Water Main Replacement - Water main replacement
  • Stoneridge Court (Williamsburg Manor to north end of cul-de-sac):  2018 Water Main Replacement - Water main replacement
  • Sublett Road (Cooper Street to Matlock Road):  Concrete Panel & Sidewalk Replacement Program – Removal and replacement of curb, gutter, concrete panels and failed sections of sidewalks at various locations throughout the City
  • Suffolk Drive (Wentworth Drive to Redstone Drive):  Sublett Creek Neighborhood Drainage Improvements – Stormwater, paving, water and sanitary sewer improvements; channel turf reinforcement, and pedestrian lighting
  • Summergrove Drive (Tiverton Court to 3318 Summergrove Drive):  Sublett Creek Neighborhood Drainage Improvements – Stormwater, paving, water and sanitary sewer improvements; channel turf reinforcement, and pedestrian lighting
  • Surrey Circle (Grants Parkway to south dead end):  2018 Water Main Replacement - Water main replacement
  • Sussex Drive (Center Street to Barrington Place):  2018 Water Main Replacement - Water main replacement
  • Taylor Street (Back of Curb from Prairie Street to Division Street):  Davis Pressure Plane Phase 1 – Water line improvements to increase water pressure, sanitary sewer renewals, and street reclamation
  • Taylor Street/Houston Street (Intersection Only):  Davis Pressure Plane Phase 1 – Water line improvements to increase water pressure, sanitary sewer renewals, and street reclamation
  • Teakwood Drive (Arkansas Lane to Grants Parkway):  2018 Water Main Replacement - Water main replacement
  • Tech Center Parkway (New York Avenue to Design Road):  Concrete Panel & Sidewalk Replacement Program – Removal and replacement of curb, gutter, concrete panels and failed sections of sidewalks at various locations throughout the City
  • Thannisch Drive (Center Street to 1011 Thannisch Drive): Johnson Creek Sewer (Center Street to Collins Street) - Reroute sewer lines in Johnson Creek with 2,100 linear feet of sewer running in Center Street, Thannisch Drive, and Roosevelt Street
  • Third Street (Elm Street to Mary Street):  2017 Residential Rebuild Phase 2 - Rebuild roadway, stormwater, water, and sanitary sewer infrastructure improvements; street lights, and sidewalks
  • Thomas Chapel Drive (Center Street to Barrington Place): 2017 Residential Rebuild Phase 2 - Rebuild roadway, stormwater, water, and sanitary sewer infrastructure improvements; street lights, and sidewalks
  • Timberlake Drive (E. City Limits to Park Row Drive):  Pavement reclamation, drainage improvements, sewer renewals, street lights, and sidewalks
  • Timberlake Drive (Park Row Drive to Pioneer Parkway):  Rebuild roadway with 10-inch concrete pavement, drainage improvements, sewer renewals, street lights, and sidewalks
  • Timberview Lane (150-feet west of Fallcreek Street to Barrington Place):  2018 Water Main Replacement - Water main replacement
  • ​Trinity Branch Sanitary Sewer Renewal:​  Sanitary sewer line replacement at Riverside Golf Course
  • Vonner Court (Thannisch Drive to north end of cul-de-sac):  Johnson Creek Sewer (Center Street to Collins Street) - Reroute sewer lines in Johnson Creek with 2,100 linear feet of sewer running in Center Street, Thannisch Drive, and Roosevelt Street
  • Weeks Avenue (Abram Street to Border Street): Rebuild roadway with improved stormwater, water, and sanitary sewer infrastructure; pedestrian enhancements, street lighting, and landscaping
  • Westcrest Drive (England Road to Sherwood Drive):  Davis Pressure Plane Phase 1 – Water line improvements to increase water pressure, sanitary sewer renewals, and street reclamation
  • Westview Terrace/Second Street (Intersection Only):  Davis Pressure Plane Phase 1 – Water line improvements to increase water pressure, sanitary sewer renewals, and street reclamation
  • Williamsburg Manor (150-feet west of Burningtree Court to Burningtree Court):  2018 Water Main Replacement - Water main replacement
  • Williamsbug Manor (Fallcreek Street to Center Street):  2018 Water Main Replacement - Water main replacement
  • Winewood Lane (Sidewalks between Bowen Road to Tucker Boulevard):  2018 ADA and Safe Route/Sidewalk Project – In-house ADA requests and selected safe route to school locations
  • Woodrow Street/Sanford Street (Intersection Only):  Davis Pressure Plane Phase 1 – Water line improvements to increase water pressure, sanitary sewer renewals, and street reclamation
  • Wynn Terrace (Oleander Drive and New York Avenue):  Concrete Panel & Sidewalk Replacement Program – Removal and replacement of curb, gutter, concrete panels and failed sections of sidewalks at various locations throughout the City