An image of the boundary map for the SH360 Corridor Strategy

The City is conducting a comprehensive study of the existing conditions and opportunities along the South SH 360 corridor, to create a vision and associated implementation strategies to ensure the future success of the corridor. Covering the area from Interstate 20 on the north to the City Limit to the south, the study is engaging significant community involvement to guide future development, strengthen neighborhoods, build community capacity, improve transportation and safety, enhance economic development, and position the South SH360 area as a strong southeastern gateway to the broader Arlington community. The study is expected to be adopted in April 2022.

You can sign-up for regular updates about the project and receive public meeting reminders by registering your email address with the project team. 

Click here to sign-up for project update emails

PROJECT STATUS: DRAFT PLAN DEVELOPMENT

The City is developing the draft plan document based on community input and the market analysis. The draft document will be available for public review in January 2022. The links below show the preliminary recommendations that were released in November 2021. 

View the DRAFT South SH 360 Corridor Development Strategy

Preliminary Recommendations - Universal Strategies

Preliminary Recommendations - Sector Strategies

Public Input Period #3

Online Survey Open: January 18-28, 2022

Take the English Survey

Take the Spanish Survey

Take the Vietnamese Survey

Virtual Public Meeting:

When: January 24, 2022 at 6:30 pm

  Click here to attend the Virtual Public Meeting