Public Works Main Page
  TRAFFIC
Traffic Operations
Traffic Operations FAQ
Getting Around the City
Traffic Studies FAQ
Traffic Information
 
  STREETS
Street Maintenance
Street Sales Tax
 
  STORMWATER DRAINAGE
Stormwater Drainage Utility Fee
Stormwater Drainage Concern FAQ
Stormwater Drainage Utility Fee FAQ
Proposed Projects (pdf)
Project Rankings (pdf)
 
  SPECIAL TRANSIT
Park & Ride
 
  ENGINEERING
General Information
Construction Services
Ponding Program
Forms
Technical Information
Project Information
Floodplain/Elevation
Typical Details
 
  CONSTRUCTION MGNT
General Information
Project Information
 
  REAL ESTATE SERVICES
General Information
Surplus Property
Bid Packet Request
Real Estate FAQ
 
  F.A.Q.  
  CONTACT US  
 

Department of Public Works
101 W. Abram St.
Arlington, TX 76010

Phone: 817-459-6550
 
E-mail

 
 

 

 

 
title graphic for Public Works & Transportation

STREETS :: STREET MAINTENANCE SCHEDULE :: FY 2006/2007

The following files are in pdf file format and require Adobe Acrobat in order to be able to view them. If you don't have it, you can download it here.

Property owners will be notified by door hanger 48 hours prior to scheduled maintenance.  Additionally, the City will mail letters within 2-3 weeks of scheduled work, explaining the project.

Micro-surfacing, micro-sealing and asphalt overlays improve mobility, extend the life of pavement and seal the surface of streets to prevent moisture and deterioration.

Click on the following PDF files to find out if your street is scheduled for maintenance in FY 2007/2008. Streets are listed by Council District.

bullet Micro-Seal (pdf)
 
bullet Mill & Overlay (pdf) 
 
bullet Mill & Overlay Reclamation Map (pdf)

Archives

bullet 2007
 
bullet 2006
 
bullet 2005
 
bullet 2004
 
bullet 2003

[ back ]